Monthly Archives: February 2015

2015-01 instrument panel removal – final time ?

After playing around with the avionics cables inside the airplane, trying to align them, combine wires into bundles etc. I found that I should finish up the instrument panel. So for what is hopefully the last time, the instrument is … Continue reading

Posted in Avionics, Building, Electrical System, Instrument Panel | Leave a comment

2015-01 GPS antennae installed

Another item on the list was to install the GPS antennae permanently. Both teardrop antennae were mounted on each side of the airplane in front of each pilots, forward of the avionics. With the GDL39R returning to its old position, … Continue reading

Posted in Avionics, Instrument Panel | Leave a comment

2015-01 Aileron Torque Tube assembly

One of the items on the ‘finish’ list had been the torque tube assembly for a while. From front to back at the whale tail, I would be able to complete this task with a little bit of work. First, … Continue reading

Posted in Building, Flight Controls, Fuselage | Leave a comment

2015-01 GDL39R placement change.

After starting some wiring, I figured out that I had to drill a hole through the bulkhead, below the canard. Since I already drilled one for the static hose, I was left with little space. The only solution was to … Continue reading

Posted in Avionics, Fuselage, Instrument Panel | Leave a comment