-
Recent Posts
Equipment Manufacturers
Archives
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- March 2020
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- August 2016
- July 2016
- June 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- July 2014
- June 2014
- April 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- May 2013
- February 2013
- January 2013
- December 2012
- November 2012
- September 2012
- August 2012
- May 2012
- April 2012
- March 2012
- October 2011
- September 2011
Categories
-
Monthly Archives: March 2021
2021-03 Finishing work – runup, brakes
Starting this day a little early and install the back seat and aft cabin wall in anticipation of weighing the aircraft. We also installed the frontseats and Howard put most of the remaining labels we require, on the flight and … Continue reading
Posted in Accesories, Engines, Finishing, Wings & Canard
Leave a comment
2021-03 Finishing Work – covers
Today I also cut the covers that will fit underneath the fuelstrake to cover the holes on the front spar. These holes remain open to suck the air through the aircraft and provide airflow in the cabin. With silicone kit, … Continue reading
Posted in Building, Documents, Wings & Canard
Leave a comment
2021-03 Finishing work – FLT Controls and power issues
We started with installing the missing washer on the RH inner wing connection. The washer was missing until a recent cleanup, and so we finally could finish that item. Howard checked the trim on the RH side stick, and we … Continue reading
2021-03 Finishing work – FLT Controls and power issues
Big day!! Flight controls .. ALL complete! We finally connected all the rudder cables, added eyelets, and aligned the wires and made them taut.. the RH rudder needs an little adjustment so it moves freely, but this is the first … Continue reading
Posted in Electrical System, Finishing, Flight Controls, Fuselage
Leave a comment
2021-03 Finishing work –
We got to quite a few items on the punch out list. The engine cooking inlets were checked as we had earlier issues trying to close the cowling. The screws are now lined up. Aad and Howard did most of … Continue reading
Posted in Engines, Finishing
Leave a comment
2021-03 Finishing work – Runup
Got some support at the hangar today. Dana Brantley-Sieders got to experience an engine testrun and I got to hear about little fixes she sqauwked about. A win-win! After that, i checked a few items that needed doublechecking. I was … Continue reading
Posted in Engines
Leave a comment
2021-03 Finishing work – brakes and runup
Aad Zeeuw and I took the bird outside, and cleaned the hangar. Then we rolled it back in, and regreased all main gear bearings. I had noted that the RH main gear needed greasing, but I found both were completed … Continue reading
Posted in Building, Instrument Panel, Landing Gear
Leave a comment
2021-03
Today we completed big item on the list.. putting the wings back on. But before we started.. I went through the cabling behind the instrument panel, making sure all connectors were tightly fastened onto the wires, and reconnected some loose … Continue reading
Posted in Building, Finishing, Flight Controls, Wings & Canard
Leave a comment