Category Archives: Landing Gear

2021-04 Finishing Work

The last little bits.. except today we handled some big important items. First, I put more stickers on my plane, door close position etc. The inspector is apparently big on those. Then Howard came in and he tested the up … Continue reading

Posted in Building, Flight Controls, Landing Gear | Leave a comment

2021-04 Finishing work

Today I spend rerigging the ailerons to get required deflections. It’s at required settings now, except RH down, which is 1/8″ short. I am tempted to leave it as I don’t believe it will be a huge detrimental factor. I … Continue reading

Posted in Building, Documents, Engines, Flight Controls, Landing Gear | Leave a comment

2021-04 Finishing Work – Oil Cooler, Pitot Static

The little stuff just keeps on coming.. I finally finished putting the oil cooler back. Lots of nasty words were uttered, but I was alone.. it got done. Then worked on the pitot static to hook up the Dynon D6.. … Continue reading

Posted in Avionics, Building, Engines, Finishing, Landing Gear | Leave a comment

2021-03 Finishing work – brakes and runup

Aad Zeeuw and I took the bird outside, and cleaned the hangar. Then we rolled it back in, and regreased all main gear bearings. I had noted that the RH main gear needed greasing, but I found both were completed … Continue reading

Posted in Building, Instrument Panel, Landing Gear | Leave a comment

2020-12 Socks added to Main LDG Gear

Anastacia Sieders and I put on sock pair #3.. The fiberglass socks for a more smooth end surface. It was worth feeding her ice cream afterwards..

Posted in Building, Landing Gear | Leave a comment

2020-12 Addng Socks to Main LDG Gear

Second pair of socks installed with Dana Brantley-Sieders help… all done within an hour..

Posted in Building, Landing Gear | Leave a comment

2020-12 Socks added to Main LDG Gear.

Howard Kohnstamm and I sanded down both main gear legs and readied them for the carbon fiber socks. I called the factory and talked to Chad, who talked me through the process he uses. We cleaned the legs with alcohol … Continue reading

Posted in Building, Landing Gear | Leave a comment

2020-11 Main Landing Gear items.

Finally changed out the landing gear nuts to 5/8″-11 grade 8 locknuts. I couldn’t find them in my package, but ordered 10.. if someone needs them.. Following the building logbook, I noted that my bolts were more robust sized. in … Continue reading

Posted in Landing Gear | Leave a comment

2018-05. Nosewheel cover

After making sure that the cover was in the right place, it was time to drill the holes bigger, and put nutplates on the forward nosewheel cover to attach them together. After a quick install, it looks pretty good. I … Continue reading

Posted in Building, Landing Gear | Leave a comment

2017-10 We have Brakes !

As part of the long list of squawks, and my desire to make it shorter, quickly, I ended up working on another item that had been on the list for a long time. The brakes. The lines and the pedals … Continue reading

Posted in Building, Landing Gear | Leave a comment